Reanchoring used to only happen when a user confirmed a WAIT_USER
step, so anything the schedule advanced through on its own (a ramp
reaching target, a hold timing out) left the forecast showing a
stale, increasingly wrong prediction once reality diverged from it.
_reanchor_forecast() now fires from on_step_changed() on every real
transition, splicing in a fresh simulation anchored at the real
current temperature/elapsed time instead.
Also fixes two bugs surfaced while testing that change:
- estimate()'s early-return for an empty/not-yet-loaded schedule still
returned the old 4-tuple shape, crashing every connection before a
Sud was ever Loaded.
- send_forecast() and _reanchor_forecast() can run concurrently (e.g.
a fresh Start triggers both at once), and whichever resumed second
after its own worker-thread simulation would blindly splice its tail
onto whatever the other had already written, producing a spurious
connecting line across the plot. Both now carry a generation counter
and discard their result if a newer call has since committed.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_019qvu5giu7gvRCyEWzf2Vpx