jens 3289288488 Pre-visualize the estimated Sud course in the Automatic tab
Adds a static forecast plot to the (previously empty) Automatic tab,
showing the planned temperature course derived from a schedule's
declared ramp rates and hold durations alone (no plant/controller
model - just how long the schedule itself says each step takes).

The client now requests the schedule via Download right after
connecting, routing the reply to the forecast instead of a save
dialog since sud_download_path is only set for the user-initiated
download. SudTask also echoes the just-applied document back after a
successful Upload, so editing the schedule refreshes the forecast
without an extra round trip.